Construction Scheduler - QDC
Quanta Infrastructure Solutions Group
स्रोत: Himalayas — अधिकृत फ़ीड
- स्थान
- संयुक्त राज्य
- नौकरी का प्रकार
- रिमोट
- अनुभव
- वरिष्ठ
- प्रकाशित
- 16 नव॰ 2026
- अंतिम बार लाइव देखा गया
- 17 नव॰ 2026
- स्रोत
- Himalayas
- नियोक्ता
- Quanta Infrastructure Solutions Group
यह लिंक Himalayas पर सूची खोलता है, जहाँ आवेदन आगे बढ़ता है। यह पुष्टि नहीं है कि यह नियोक्ता की अपनी वेबसाइट है।
नौकरी का विवरण
स्वचालित अनुवाद सक्षम नहीं है। नौकरी का विवरण उसकी मूल भाषा में दिखाया गया है।
About Us
QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house talent, expertise and resources to plan, design, engineer, manage, conduct maintenance on and construct projects.
Our turnkey service capabilities provide our customers with efficiency, consistency, attention to detail and safe execution. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.
About this Role
Location: Remote (U.S.) with travel up to 30% to project sites in Texas.
QISG is seeking experienced Primavera P6 Schedulers to support major EPC, Design-Build, and CMAR projects.
Partner with Project Managers, Engineers, and field teams to develop and manage resource-loaded schedules from planning through construction and commissioning. Ideal candidates bring P6 scheduling experience in data centers, commercial infrastructure, or complex construction projects, with strong skills in critical path management, forecasting, and schedule execution.
What You'll Do
Develop and maintain CPM schedules.
Build and update resource- and cost-loaded Primavera P6 schedules.
Integrate inputs from engineering, procurement, construction, and commissioning (intra-company or subcontractor) teams.
Link WBS to CBS for accurate forecasting, cash flow, and financial alignment.
Produce earned value metrics, schedule KPIs, and cash flow reports for project controls and executive reporting.
Conduct critical path analysis, what-if scenarios, productivity tracking, and time-impact assessments.
Identify schedule risks, evaluate sequencing, and recommend mitigation strategies.
Support look-ahead planning, short-interval schedules, and continuous improvement.
Maintain compliant schedule documentation per contract and company standards
What You'll Bring
4-10 years of scheduling experience in Engineering/Procurement/Construction (EPC) industry.
- Data center or Commercial Infrastructure P6 scheduling experience.
- Primavera P6 expertise, including cost- and resource-loaded schedule development.
Experience with large-scale sitework, and long-lead equipment schedules for data center or commercial projects.
Familiarity with Deltek Acumen Fuse/Risk, or similar schedule analysis tools.
Ability to collaborate with engineering, permitting, procurement, construction, and commissioning teams.
Strong communication and influencing skills, coordinating across multiple departments.
Highly organized and self-motivated, able to manage multiple priorities in fast-paced environments.
- Able and willing to travel up to 30% to domestic construction project sites or project offices.
High school diploma required; Bachelor’s in Engineering, Construction Management, Business, or related field preferred.
What You'll Get
Competitive base salary
Generous PTO & paid holidays to maintain work-life balance
401(k) with a generous match to plan for your future
Comprehensive benefits – medical, dental, vision, and life insurance
Weekly pay for consistent, reliable compensation
Great mentoring & career growth opportunities – we invest in your development
Equal Opportunity Employer
All qualified applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, national origin or ancestry, sex (including gender, pregnancy, sexual orientation, and/or gender identity), age, disability, genetic information, veteran status, and/or any other basis protected by applicable federal, state or local law.We are an Equal Opportunity Employer, including disability and protected veteran status. We prohibit all types of discrimination and are committed to providing access and equal opportunity for individuals with disabilities. For additional information or if reasonable accommodation is needed to participate in the job application, interview, or hiring processes or to perform the essential functions of a position, please contact us the Company’s Human Resources department.
Originally posted on Himalayas
नौकरियाँ Himalayas द्वारा उपलब्ध · himalayas.app
इस नौकरी के बारे में
यह पेज एक सक्रिय नौकरी का वर्णन करता है: Quanta Infrastructure Solutions Group में Construction Scheduler - QDC, स्थान संयुक्त राज्य के रूप में सूचीबद्ध।
Frequently asked questions
- यह नौकरी कहाँ स्थित है?
- यह नौकरी संयुक्त राज्य के रूप में सूचीबद्ध है।
- यह किस प्रकार का कार्य है?
- यह Quanta Infrastructure Solutions Group में रिमोट की भूमिका है।
- यह नौकरी कब प्रकाशित हुई थी?
- यह नौकरी 16 नव॰ 2026 को प्रकाशित हुई थी।
- मैं इस नौकरी के लिए आवेदन कहाँ करूँ?
- इस पेज पर दिए गए आवेदन लिंक का उपयोग करें। यह Himalayas पर मूल सूची खोलता है, जहाँ आप आवेदन करते हैं — StrideRecruit आवेदन स्वीकार नहीं करता।