Zum Hauptinhalt springen
StrideRecruit

Construction Scheduler - QDC

Quanta Infrastructure Solutions Group

Quelle: Himalayas — autorisierter Feed

Standort
Vereinigte Staaten
Anstellungsart
Remote
Erfahrung
Senior
Veröffentlicht
16.11.2026
Zuletzt live gesehen
17.11.2026
Quelle
Himalayas
Arbeitgeber
Quanta Infrastructure Solutions Group
Auf Himalayas ansehen und bewerben ↗

Dieser Link öffnet die Anzeige auf Himalayas, wo die Bewerbung fortgesetzt wird. Es ist nicht bestätigt, dass es die Website des Arbeitgebers selbst ist.

Stellenbeschreibung

Automatische Übersetzung ist nicht aktiviert. Die Stellenbeschreibung wird in der Originalsprache angezeigt.

About Us

QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house talent, expertise and resources to plan, design, engineer, manage, conduct maintenance on and construct projects.

Our turnkey service capabilities provide our customers with efficiency, consistency, attention to detail and safe execution. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.

About this Role

Location: Remote (U.S.) with travel up to 30% to project sites in Texas.

QISG is seeking experienced Primavera P6 Schedulers to support major EPC, Design-Build, and CMAR projects.

Partner with Project Managers, Engineers, and field teams to develop and manage resource-loaded schedules from planning through construction and commissioning. Ideal candidates bring P6 scheduling experience in data centers, commercial infrastructure, or complex construction projects, with strong skills in critical path management, forecasting, and schedule execution.

What You'll Do

  • Develop and maintain CPM schedules.

  • Build and update resource- and cost-loaded Primavera P6 schedules.

  • Integrate inputs from engineering, procurement, construction, and commissioning (intra-company or subcontractor) teams.

  • Link WBS to CBS for accurate forecasting, cash flow, and financial alignment.

  • Produce earned value metrics, schedule KPIs, and cash flow reports for project controls and executive reporting.

  • Conduct critical path analysis, what-if scenarios, productivity tracking, and time-impact assessments.

  • Identify schedule risks, evaluate sequencing, and recommend mitigation strategies.

  • Support look-ahead planning, short-interval schedules, and continuous improvement.

  • Maintain compliant schedule documentation per contract and company standards

What You'll Bring

  • 4-10 years of scheduling experience in Engineering/Procurement/Construction (EPC) industry.

  • Data center or Commercial Infrastructure P6 scheduling experience.
  • Primavera P6 expertise, including cost- and resource-loaded schedule development.
  • Experience with large-scale sitework, and long-lead equipment schedules for data center or commercial projects.

  • Familiarity with Deltek Acumen Fuse/Risk, or similar schedule analysis tools.

  • Ability to collaborate with engineering, permitting, procurement, construction, and commissioning teams.

  • Strong communication and influencing skills, coordinating across multiple departments.

  • Highly organized and self-motivated, able to manage multiple priorities in fast-paced environments.

  • Able and willing to travel up to 30% to domestic construction project sites or project offices.
  • High school diploma required; Bachelor’s in Engineering, Construction Management, Business, or related field preferred.

What You'll Get

  • Competitive base salary

  • Generous PTO & paid holidays to maintain work-life balance

  • 401(k) with a generous match to plan for your future

  • Comprehensive benefits – medical, dental, vision, and life insurance

  • Weekly pay for consistent, reliable compensation

  • Great mentoring & career growth opportunities – we invest in your development

Equal Opportunity Employer

All qualified applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, national origin or ancestry, sex (including gender, pregnancy, sexual orientation, and/or gender identity), age, disability, genetic information, veteran status, and/or any other basis protected by applicable federal, state or local law.We are an Equal Opportunity Employer, including disability and protected veteran status. We prohibit all types of discrimination and are committed to providing access and equal opportunity for individuals with disabilities. For additional information or if reasonable accommodation is needed to participate in the job application, interview, or hiring processes or to perform the essential functions of a position, please contact us the Company’s Human Resources department.

Originally posted on Himalayas

Stellenangebote bereitgestellt von Himalayas · himalayas.app

Über diese Stelle

Diese Seite beschreibt eine aktuelle Stelle: Construction Scheduler - QDC bei Quanta Infrastructure Solutions Group, angegeben als Vereinigte Staaten.

Frequently asked questions

Wo ist diese Stelle angesiedelt?
Diese Stelle ist angegeben als Vereinigte Staaten.
Um welche Art von Arbeit handelt es sich?
Dies ist eine Remote-Position bei Quanta Infrastructure Solutions Group.
Wann wurde diese Stelle veröffentlicht?
Diese Stelle wurde am 16.11.2026 veröffentlicht.
Wo bewerbe ich mich auf diese Stelle?
Nutze den Bewerbungslink auf dieser Seite. Er öffnet das Originalinserat auf Himalayas, wo du dich bewirbst — StrideRecruit nimmt keine Bewerbungen entgegen.
Anzeige melden

Sagen Sie uns, wenn diese Anzeige falsch wirkt. Wir prüfen Meldungen; eine Meldung entfernt die Anzeige nicht von selbst.

Wir fragen weder nach Name noch E-Mail und speichern Ihre IP-Adresse nicht mit der Meldung.