Skip to main content
StrideRecruit

Construction Scheduler - QDC

Quanta Infrastructure Solutions Group

Source: Himalayas — authorized feed

Location
United States
Job type
Remote
Experience
Senior
Posted
Nov 16, 2026
Last seen live
Nov 17, 2026
Source
Himalayas
Employer
Quanta Infrastructure Solutions Group
View on Himalayas and apply ↗

This link opens the listing on Himalayas, where the application continues. It is not confirmed to be the employer's own website.

Job description

About Us

QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house talent, expertise and resources to plan, design, engineer, manage, conduct maintenance on and construct projects.

Our turnkey service capabilities provide our customers with efficiency, consistency, attention to detail and safe execution. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.

About this Role

Location: Remote (U.S.) with travel up to 30% to project sites in Texas.

QISG is seeking experienced Primavera P6 Schedulers to support major EPC, Design-Build, and CMAR projects.

Partner with Project Managers, Engineers, and field teams to develop and manage resource-loaded schedules from planning through construction and commissioning. Ideal candidates bring P6 scheduling experience in data centers, commercial infrastructure, or complex construction projects, with strong skills in critical path management, forecasting, and schedule execution.

What You'll Do

  • Develop and maintain CPM schedules.

  • Build and update resource- and cost-loaded Primavera P6 schedules.

  • Integrate inputs from engineering, procurement, construction, and commissioning (intra-company or subcontractor) teams.

  • Link WBS to CBS for accurate forecasting, cash flow, and financial alignment.

  • Produce earned value metrics, schedule KPIs, and cash flow reports for project controls and executive reporting.

  • Conduct critical path analysis, what-if scenarios, productivity tracking, and time-impact assessments.

  • Identify schedule risks, evaluate sequencing, and recommend mitigation strategies.

  • Support look-ahead planning, short-interval schedules, and continuous improvement.

  • Maintain compliant schedule documentation per contract and company standards

What You'll Bring

  • 4-10 years of scheduling experience in Engineering/Procurement/Construction (EPC) industry.

  • Data center or Commercial Infrastructure P6 scheduling experience.
  • Primavera P6 expertise, including cost- and resource-loaded schedule development.
  • Experience with large-scale sitework, and long-lead equipment schedules for data center or commercial projects.

  • Familiarity with Deltek Acumen Fuse/Risk, or similar schedule analysis tools.

  • Ability to collaborate with engineering, permitting, procurement, construction, and commissioning teams.

  • Strong communication and influencing skills, coordinating across multiple departments.

  • Highly organized and self-motivated, able to manage multiple priorities in fast-paced environments.

  • Able and willing to travel up to 30% to domestic construction project sites or project offices.
  • High school diploma required; Bachelor’s in Engineering, Construction Management, Business, or related field preferred.

What You'll Get

  • Competitive base salary

  • Generous PTO & paid holidays to maintain work-life balance

  • 401(k) with a generous match to plan for your future

  • Comprehensive benefits – medical, dental, vision, and life insurance

  • Weekly pay for consistent, reliable compensation

  • Great mentoring & career growth opportunities – we invest in your development

Equal Opportunity Employer

All qualified applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, national origin or ancestry, sex (including gender, pregnancy, sexual orientation, and/or gender identity), age, disability, genetic information, veteran status, and/or any other basis protected by applicable federal, state or local law.We are an Equal Opportunity Employer, including disability and protected veteran status. We prohibit all types of discrimination and are committed to providing access and equal opportunity for individuals with disabilities. For additional information or if reasonable accommodation is needed to participate in the job application, interview, or hiring processes or to perform the essential functions of a position, please contact us the Company’s Human Resources department.

Originally posted on Himalayas

Jobs provided by Himalayas · himalayas.app

About this job

This page describes one live job: Construction Scheduler - QDC at Quanta Infrastructure Solutions Group, listed as United States.

Frequently asked questions

Where is this job based?
This job is listed as United States.
What kind of work is this?
This is a Remote role at Quanta Infrastructure Solutions Group.
When was this job posted?
This job was posted on Nov 16, 2026.
Where do I apply for this job?
Use the Apply link on this page. It opens the original listing on Himalayas, where you apply — StrideRecruit does not take applications.
Report this listing

Tell us if this listing looks wrong. We review reports; a report does not remove the listing by itself.

We do not ask for your name or email and do not store your IP address with the report.